Wednesday, May 11, 2011

Case Study - Chesterton, IN Blower Power Consumption Analysis

Universal Blower Pac has been asked to explore the benefit of upgrading the Chesterton, IN Fritz C. Dietrich Environmental Control Facility with high efficiency blower systems. The intent is to reduce power consumption and the corresponding cost to operate the equipment. The current blower system, power consumption, and ongoing operating cost has been evaluated and compared with three different proposed blower systems....



No comments:

Post a Comment